Energy Solar Tech

Acabados INSA - 500 kWp

Location:
Onteniente – Valencia

Industry:
Textile Manufacturing

Date:
April 2022

The project

Installation in a 500 kWp turnkey project carried out at the textile factory that Acabados Insa has in Onteniente, Valencia. The installation consists of 773 panels on the roof, achieving that the self-consumption coverage over the total energy demand of the plant slightly exceeds 53%.