Outsourced Energy Installation of 1,115 kWp carried out in the Pastisfred Industrial Pastry and Bakery products factory in Tarragona. With this installation, self-consumption coverage of the plant’s total energy demand reaches almost 20% thanks to its 1,772 solar panels.