Energy Solar Tech

Redondo Iglesias - 534 kWp

Location:
Utiel (Spain)

Industry:
Food Manufacturing

Date:
2023

The project

Outsourcing Energy installation of 653 kWp carried out in the Jamones de Redondo Iglesias S.L. factory in Utiel, Valencia, consisting of a total of 814 solar panels. With this installation, self-consumption coverage over the total energy demand of the plant reaches almost 37%. Energy Solar Tech has also reached an agreement to execute another installation with similar characteristics in the facilities that the Redondo Iglesias Group has in Candelario, Salamanca, which is about to be executed.