Energy Solar Tech

Valdelugo Hybrid Park

Location:
Burgos (Spain)

Date:
2022

Power:
18MW+16MW

The project

18 MW wind farm in the hybridization phase of 16 MW to produce 92,400,000 kWh in combined mode, equivalent to the average consumption of 28,250 homes. It currently consists of wind turbines composed of 5 GE 137 Tier 1 turbines